GAS EXHAUST STACK FOR BBC, GAS TURBINE TYPE GT 11 L BUILT IN 1968
CHALLENGE
Replica of a replacement stack for a 30-year-old gas power plant in Nigeria.
Complete material procurement, production according to original plans from 1968, seaworthy packaging, delivery time 10 weeks.
SOLUTION
We discussed with the client the outdated specifications and the drawings from 1968 in detail. L + M AG, with the clients approval, then revised the overall design. We made improvements and adjustments to design details as well as to the materials in a timely and efficient manner.
The stack was designed, built and packaged in four transportable units using the lastest state of the art technology.